NLOL Unit Renovation Project Info Webinar

TAA's New Lease on Life,

Earlier this morning we hosted an Info Session Webinar about our Unit Renovation Project with A New Lease on Life and Family Promise of Wake County. Below is a recording of the webinar and all the referenced materials. Our goal is to renovate units 2 and 3, simultaneously, between October 21, 2019 and November 8, 2019. In order to do that, we need commitments by October 10, 2019. If you are interested in learning more or getting involved, contact Meg Palumbo at mpalumbo@triangleaptassn.org or 919-782-1165 ext 1.

Project Scope of Work (Outline of project)

Commitment Form

PowerPoint Slide Deck

3-Minute Test Unit Video*

*This is the 3-minute video about the process of completing the test unit as seen in the webinar.

While the items within each apartment will match, the different apartment's finishings do not need to match each other. That will allow us to accept donations of overstock from shops or renovation projects!

Here are some of the items we need:

  • Wall Paint (Agreeable Grey)
  • Ceiling Paint (White)
  • Trim Paint (White)
  • Light Fixtures
  • Bathroom Hardware (Faucets, towel holders, shower rod, etc.)
  • Toilets & Toilet Seats
  • Door Knobs
  • Cabinet Knobs
  • Blinds
  • 6 panel doors
  • Kitchen Cabinets (White; Full Plywood Box; Shaker Style; Standard Overlay)
  • Countertops (10 linear ft kitchen countertop - 22 sq ft countertops - per apt (quartz preferred))
  • Bath Cabinets/Sinks (30” bath vanities w/ cultured marble countertop)
  • Flooring (Luxury Plank Vinyl, 6.5mm thickness 12mil wear layer with pad attached)
  • Stainless Kitchen Sinks
  • Bathroom Mirrors
  • Smoke Detectors
  • Light Switch Covers (White)
  • Appliances (Fridge, Stove, Range Hood - stainless)
  • Furniture (Couches, dressers, twin beds, kitchen table and chairs.)

 


Recorded Webinar (10/1/2019)